
Extensions to existing flood walls
We believe these are the critical seven steps to a successful project.This disciplined approach makes sure all important issues are considered, that nothing is overlooked, thus avoiding surprises and cost overruns as the project nears completion.
- Thorough initial site inspection and feasibility analysis.
- Careful soil tests and analysis of satellite/flood plain/waterflow maps obtained from First American.
- On-site inspection and meeting with European Engineering/Design team.
- Complete project engineering/design/cost review presentation, including a complete manual on set-up, removal and storage..
- Commence foundation construction and levee or ground water sealing.
- Receive removable wall system components in transportable storage containers.
- Conduct intensive training with setup crews, set up sections, tear down sections and place them in storage containers.

|